Wednesday, September 30, 2026

Cow Clinic: Part One

 

It has been awhile since my last post, and that was on purpose. I have been preparing for our private cow clinic, and I didn’t want to write about it until it was all past.

Now it is past.

I am still reflecting  

But as I do, here are some photos from yesterday. (More to come)

There was high wind, rain, a herd of bison, and a herd of horses running free and bucking around us. Safe to say, our horses were less bothered by the cows than the other elements.

But we survived. We learned. We grew.



There was, unfortunately, one mishap. It also seems to be okay today, but there will be some work getting confidence back. (It wasn’t Tumbleweed and me.)

I will probably have to break this down into several posts, starting with our preparation and ending with the day of the clinic and then post-clinic.


For now, happy trails!

Wednesday, September 2, 2026

Out of Shape Horses & Hyperscale Data Centers

 

We met with Katie yesterday to do conditioning work with Tumbleweed and Epona, and it was clear that a month off had done them no favors.  

It was Tumbleweed’s third ride since getting back to work, but Epona’s first. 

Tumbleweed’s attitude has been exceptional. He is 100% trying to do his job with a good attitude. It reminds me of the saying, “the mind is willing, but the body’s weak.”

Katie didn’t want to overdo it, so she stopped after about 30 minutes and handed him over to me to do light obstacle work. 

He did everything for me, and more. We ended up dragging the log all around the park. He loves that “obstacle” now.  

Which reminds me, I’m putting together a private cow clinic for me and my friends at a local ranch. We’re trying to decide on the date, but it’s looking like the end of September. I can’t wait! Tumbleweed is going to love it! All day with my horse, good friends, and some cows. Perfect. 

I talked to Katie about his lack of conditioning and a plan to get him back in shape. She thinks one day of the collection work and the rest trails will be enough to bring him back. So, she’s going to do the collection work and I’m going to do the trails.

I’m adding an extra day of collection work this week on Friday. The forecast calls for rain for the next five days, but I look forward to working in rain. I probably won’t get a trail ride in due to my babysitting schedule, but grandson starts two day per week preschool again next week. 

In fact, that reminds me that I will have my grandson in tow Friday, too. (Good thing for Katie!)

He enjoys sitting and watching us ride horses, but his tolerance is about an hour and a half. After that, he needs to walk around and be part of it.

While Katie rode Epona through the obstacles yesterday, daughter and grandson walked around and petted the horses. One was a fjord who is used as a local ambassador. Her name is Dolly. 


Dolly’s owner called the grandson over to see Dolly and even gave him a trading card with Dolly and all her stats as part of the COPS and SCOPE program.


On the way home he clung to his card and kept spelling out her name and talking about her. 

D-O-L-L-Y, Dolly.

Before he went to bed, we asked if he could spell Dolly, and sure enough, he remembered and spelled it out for us just from that 10 minute drive home. 

Sweet Dolly really is a unicorn. A magical ambassador for horses.

I want to circle back to my anti-data center and AI post from a few months ago. Back then, I was blissfully unaware that a hyperscale data center had targeted our area and was in talks with our local politicians and energy providers, hiding behind NDA’s.

A stay at home mom put in a records request and uncovered the plot just in time for the community to impose a moratorium and figure out how to proceed in our best interests. If they had filed for permits it would have been too late. (Their sneakiness worked against them.)

This isn’t a Republican versus Democrat issue. Both parties are in on it and my state is number 10 in numbers of data centers, even though we have a MASSIVE energy shortage and drought. 

The one trying to go in about five miles from us wants to tap into our aquifer, which could drain our private wells.

They purchased 500 acres under a shell company formed in Deleware. It would be a hyperscale data center and will eventually take 1.2 GW of electricity to run. That is more than our entire city and county at peak, and we don’t even have it to give. 

That doesn’t stop them. They’re going to piece it together and even get some from the neighboring state of Idaho.

It’s INSANE!

I found out that much of this is being financed by SWF’s, or sovereign wealth funds, who are dumping US Treasuries for gold, land, energy, and water. Hard assets.

Lovely. 

Many of these hyperscale data center projects will be like Malls for tech where they can rent out space to run their AI programs. 

Big. Ugly. Tech Malls.

Man, I hate where this is going.